|
PROJECT
HIGHLIGHTS |
|
CMDA
Approved Layout.
|
ICICI,
HDFC, LIC LOAN Arranged if required on presentation
of Standard Income Proof. |
| 2
Kms from Medavakkam / Sholinganallur. |
| 6
Kms from Velachery MRTS Railway Station. |
| Nearer
to Schools, Colleges, Hospitals, Market, etc. |
| Housing
Colony with more than 150 Flats. |
| Amenities
such as Provision Shop, Medicals, Milk, Vegetables, STD/PCO Booth
provided within the colony. |
| Services
such as 24 hour watch & ward, Shuttle Transport to Medavakkam
and Sholinganallur being arranged. |
| Abundant
Water Availability. |
|
Ample
Space for Car / Two Wheeler Parking. |
|
Click
Here to view Gurudev Colony |
| PROJECT
DETAILS |
| Name |
GURUDEV
COLONY |
| Location |
Perumbakkam
Village
Near TamilNadu Hospital |
| Total
Extent of Land |
3.4
Acres |
| No.
of Blocks |
16 |
| No.
of Floors |
Ground
Plus One |
| No
of Flats |
150 |
| Possession
Duration |
9
Months from booking |
|
Click
Here to view Building Plan |
|
PROMOTERS:
GURUDEV ESTATES
66, Audiappa St. Sowcarpet, Chennai - 79
Ph: 5294204
Pager: 9628-452210, Mobile: 98400-49467 |
| CONSTRUCTION
SPECIFICATIONS |
| Structure |
RCC
framed structure |
| Walls |
Brick
walls with Cement Plaster |
| Flooring |
Silver
Grey mosaic |
| Doors
Main Door |
Teak
Wood frames, Teak Flush Doors with varnishing |
|
Other Doors |
Kongu wood Frames Flush
Doors |
Windows
&
Ventilators |
Large
Size opening using Kongu wood
with Safety Grills. |
| Kitchen |
Cuddapah
Top Cooking Platform and Cuddapah Sink with Ceramic Tiles
up to two feet height above platform. |
| Toilet |
Ceramic
Tiles for floor and walls
up to three feet height in toilet and
five feet height in bathrooms. |
| Electrical |
Three Phase Power supply and
fully concealed wiring |
| Painting
|
Supercem colour wash for walls and
Asian / Nerolac paint for Doors and Windows. |
| Cost
Issues
|
| BedRooms
|
G.Floor
|
SQ.FT
|
Price
|
F.Floor
|
SQ.FT
|
Price
|
| Triple
|
G1
|
930
|
6.42
lacs
|
F1
|
1010
|
6.97
lacs
|
| Single
|
G2
|
397
|
2.74
|
F2
|
446
|
3.08
lacs
|
| Double
|
G3
|
547
|
3.78
|
F3
|
583
|
4.03
lacs
|
| Single
|
G4
|
454
|
3.14
|
F4
|
496
|
3.43
lacs
|
| Single
|
G5
|
385
|
2.66
|
F5
|
436
|
3.01
lacs
|
|
MODE OF PAYMENT |
|
1% of Fixed Sale Price to be
paid at the time of Booking |
14% of Fixed Sale Price to
be paid
at the time of Registration of undivided share of land |
Balance shall be arranged
from financial institution
such as LIC, HDFC etc on provision of standard income proof. |
|

|